!!Projects per year
Résumé
This study addresses the electrification of demand-responsive feeder services, a form of public transport designed to connect rural and low-demand areas to mass transit hubs. Electrifying demand-responsive transport requires planning the charging infrastructure carefully, considering the trade-offs of charging efficiency and charging infrastructure costs. This study addresses the joint planning of fleet size and charging infrastructure for a demand-responsive feeder service under stochastic demand, given a user-defined CO2 emissions reduction policy. We propose a bi-level optimization model where the upper-level determines charging station configuration given stochastic demand, and the lower-level solves a mix fleet feeder (first and last mile) service routing problem under the CO2 emission and capacitated charging station constraints. An efficient deterministic annealing metaheuristic is proposed to solve the CO2-constrained mixed fleet routing problem. The metaheuristic solves up to 500 requests within 3 minutes, demonstrating the practical applicability of the proposed solution. We applied the model to a real-world case study in Bettembourg, Luxembourg, with two types of electric minibuses and gasoline ones, under different CO₂ reduction targets considering rapid (125 kW) and super-fast (220 kW) chargers, given 200 requests per day. The results show that using 24-seat minibuses leads to significant cost savings (-49% on average) compared to that of 10-seat minibuses. Due to their larger battery capacity, charger availability has a smaller impact on the operational costs of 24-seat minibuses. The proposed method provides a flexible tool for joint charging infrastructure and fleet size planning.
| langue originale | Anglais |
|---|---|
| Numéro d'article | 127216 |
| journal | Applied Energy |
| Volume | 405 |
| Date de mise en ligne précoce | 10 déc. 2025 |
| Les DOIs | |
| état | Publié - févr. 2026 |
Projets
- 1 Terminé
-
M-EVRST: Multimodal Electric VEhicle demand RESponsive Transport
Ma, T.-Y. (PI), Klein, S. (CoI), Viti, F. (???upmproject.roles.upmproject.copi???), Chow, J. Y. J. (Non Contracting Partner), Connord, R. (CoI) & Venditti, S. (CoI)
Fonds National de la Recherche, Luxembourg Institute of Socio-Economic Research LISER
1/04/21 → 31/03/24
Projet: Recherche
Contient cette citation
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver